Drain down the existing 150mm header and installed a new 150mm connection to accommodate future phased works, reducing to 125mm to provide a temporary boiler feed.
Project Details
- Location: Malvern
- Client: L. Darby & Son
- Duration: 3 weeks
Drain down the existing 150mm header and installed a new 150mm connection to accommodate future phased works, reducing to 125mm to provide a temporary boiler feed.