Project Details
  • Location: Birmingham
  • Client: Briggs and Forrester Engineering Services
  • Duration: 12 months

Supply and install new piped services across 16 floors for the CAT A installation of a new build office block in the centre of Birmingham.

Welded, threaded and Victaulic installation of the heating and chilled water systems. Riser pipework and valve arrangements serving each floor.

Brazed and soldered installation of the domestic services from tank room to roof. Core area risers and toilet blocks serving each floor.

Fusion weld HDPE and solvent weld above-ground drainage and rainwater pipework serving the building.

Let us Take your Project to the Next Level

Whatever your project requirements, the DT Group is here to help. From mechanical installations and offsite fabrication to projects and ongoing maintenance, our three specialist divisions work together to provide the right expertise at every stage.

Contact Us
Global Accreditation 1
Global Accreditation 2
Global Accreditation 3
Global Accreditation 4
Global Accreditation 5
Global Accreditation 6